Standards
Workmanship standards.
Non‑negotiables. Prep, protection, and acceptance criteria.
Substrate prep
Base before finish.
- Substrates assessed and made suitable before finishes land.
- Moisture/flatness/adhesion risks addressed first.
- Required primers/levellers/membranes used where applicable.
- Concealed work photographed before close-in.
Protection
Protect finished work.
- Finished surfaces protected immediately after install.
- Traffic paths defined and enforced.
- Staging/storage controlled — no pile-ups on finished zones.
- Daily reset keeps the site readable and safe.
Dust / noise
Containment discipline.
- Containment used where migration matters.
- Cutting/grinding managed, not improvised.
- Noise windows respected in occupied buildings.
- Cleanup and wipe-down treated as production, not afterthought.
Acceptance criteria
What “done” means.
- Inspection in normal lighting at practical viewing distance.
- Punch items documented and tracked to closure.
- Turnover includes cleanup, protection removal, documented handoff.
- Closeout is planned — not negotiated at the end.